NWC 1.5 Checklist

As we round out our first week in our new space, I thought I’d share our checklist of things that we had to work on since we opened on Monday:

  • DONE: Get on local network and work out initial kinks
  • DONE: Integrate with Green Spaces’ conference reservation system 
  • DONE: Sort out entry/exit/open/closing procedures
  • IN PROGRESS: Fix issues with network slowdowns (GS has ordered a new access point for us)
  • IN PROGRESS: Get comfortable scheduling events in the space
  • IN PROGRESS: Label the front door and elevator button better
  • IN PROGRESS: Fix the fancy new HVAC air conditioner before it gets too hot!

Much more to do, but we’re off to a great start!

Friday, May 7, 2010 — 1 note   ()
  1. nwc2 posted this